Details:
This LNG Carrier 2026 built China is for Sale:
LNGC "TBN"
Description follows:
Ship's Name: "TBN"
(b) Builder and Yard
(c) Hull No. YX-009A
(d) Year Built 2026
(e) Port of Registry and Flag Wenzhou/ CHINA
(f)IMO Number 1040447
(g) Call Sign - na
(h) Classification Society CCS (class symbol will be clarified later)
(i) Protection and Indemnity Club CPI
(a)Length overall 229.8m
(b) Length Between Perpendiculars 226.0m
(c) Breadth molded 38.0m
(d) Depth molded 20.6/24.6m
(e) Draught at summer freeboard (Extreme) 8.50m
(f) Height overall -- keel to highest fixed point 50.90m
(g) Maximum air draft (with full ballast and
half bunkers)(corresponding drafts) 42.70m
(h) Gross Tonnage (International) 57,694 MT
(i) Net Tonnage (International) 17,308 MT
(j) Gross Tonnage (Suez) MT
(k) Net Tonnage (Suez) MT
Net Tonnage (Panama) MT
(l) Light Ship Displacement 41,290 MT
(m) Displacement (maximum) 60,500 MT
(n) Windage in normal ballast conditions:
Lateral 4,567 m2
Longitudinal 1,138 m2
(o) Classification designation LNGC
(p) Conditions of Carriage
(as defined on Certificate of Fitness): LNG
Ownership structure will be disclosed after signing the NDA. Two shipowners - both Chinese companies. Construction is 75-80% complete
Completion date: June-July 2026 (current deadline)
Reason for sale: changing macroeconomic conditions. The vessel was built for a project that has been suspended.
Price: US$ 170 million.
Please note:
How quickly can the vessel be completed?
* The vessel is afloat. 70% complete. A realistic completion date is early June 2026. The speed of completion directly depends on funding, as this completion is currently unprofitable for the shipowner.
How long will it take for the Tanker to undergo Sea Trials and state Inspection for the Register?
* Trials take from 2 weeks to 1 month. This depends on the availability of LNG for testing. State inspection is not required; upon leaving the shipyard, the vessel will have a full set of documents for navigation. If a flag of convenience is selected (Panama, Liberia, Hong Kong, etc.), no additional outfitting will be required. Minor outfitting may be required for other flags (without extending the deadline).
What is the sales procedure?
* It is planned to enter into amendments to the ship building agreement. After the vessel is completed, it can be transferred to the investor.
Ice class of the vessel;
* The vessel has no ice class.
The project was approved in December 2023. Construction began in Q4 2024.
Launched in September 2025.
Price: US$ 170 million.
Contact the Broker
Disclaimer: ALL DETAILS BELIEVED TO BE CORRECT BUT WITHOUT GUARANTEE - VESSEL OFFERED, AS IS, WHERE IS, SUBJECT TO PRIOR SALE, PRICE CHANGE, OR WITHDRAWAL WITHOUT NOTICE |