Details: 40' LNG ISO Cryogenic Tank Containers for Virtual Pipeline, LNG Distribution & Multi-Modal Transportation
New 40' ISO cryogenic tank containers designed for the international transportation and storage of Liquefied Natural Gas (LNG) by road, rail, and sea. Suitable for virtual pipeline projects, satellite LNG facilities, industrial gas distribution, marine LNG logistics, and remote energy applications.
Designed for demanding multi-modal service, these containers feature an advanced patented insulation system engineered to provide extended holding times while minimizing boil-off during repeated handling and transportation. Built to internationally recognized standards with comprehensive third-party certification.
Remote, satellite based tank monitoring for cryogenic tanks, enables companies to significantly optimize tank utilization and logistics planning. It continuously tracks the precise GPS location of each tank, operators always know where assets are deployed and can streamline fleet management. At the same time, the system measures critical process parameters such as gas pressure and the volume of liquid in the tank, providing real-time insight into operating conditions and remaining capacity. In addition, the tracker's housing temperature is recorded, closely approximating the ambient temperature around the tank, which supports safety monitoring and helps ensure stable storage conditions for cryogenic products.
Immediate Availability
122 New 40' LNG ISO Tank Containers Available
Current Production Capacity
Approximately 500 Containers Per Year
Lead Time
Approximately 50 Units Per Month
Price
EUR 155,000 Each
Subject to Prior Sale or Commitment
Principal Specifications
40' ISO Cryogenic Tank Container
UN T75 Design
Nominal Capacity 36,600 Liters
Maximum Gross Weight 36,600 kg
Approximate Tare Weight 15,000 kg
Maximum Payload 16,100 kg
Maximum Working Pressure 0.60 MPa
Design Pressure 0.76 MPa
Hydrostatic Test Pressure 0.91 MPa
Operating Temperature Range -40°C to +50°C
Reference Holding Time Minimum 86 Days (Certified)
Container Dimensions 12,192 mm x 2,438 mm x 2,591 mm
Maximum Stacking Load 192,000 kg
Designed for Road, Rail & Sea Transportation
Construction
Stainless Steel Cryogenic Inner Vessel
Low Alloy Steel Outer Vessel
Heavy-Duty ISO Container Frame
Advanced Patented Thermal Insulation System
Vacuum Insulated Construction
Stainless Steel Internal Piping
Mechanical Liquid Level Gauge
Pressure Gauge
Remote Emergency Valve Closure
Lockable Valve Compartment
Stainless Steel Instrument Panel
Industrial Multi-Coat Corrosion Protection System
Heavy-Duty Marine Finish
Certifications & Compliance
UN T75 Tank Container
ASME Section VIII Division 1
EN 13530-2/A1
Bureau Veritas Certified
ADR
RID
IMDG Code
CSC
ISO 668
Suitable for International Road, Rail & Marine Transport
Applications
Virtual LNG Pipelines
Satellite LNG Storage Facilities
Peak Shaving Installations
Industrial Gas Distribution
Marine LNG Fuel Logistics
Remote Power Generation
Mining Operations
Island Communities
Temporary Energy Supply
Cryogenic Transportation Projects
Additional Equipment Available
Helium Cryogenic ISO Tank Containers
Other Cryogenic Gas Tank Containers Available for Qualified Buyers
Features
Designed for Multi-Modal Transportation
Extended Certified Holding Time
Heavy-Duty ISO Construction
Patented Thermal Insulation Technology
Low Boil-Off Performance
Worldwide Transport Capability
Third-Party Certified Design
Suitable for International Service
Contact Horizon Ship Brokers
Complete technical specifications, drawings, certifications, pricing, availability, and commercial proposals available upon request.
New 40' LNG ISO cryogenic tank containers for virtual pipeline applications, LNG transportation, and industrial gas distribution. UN T75 design with Bureau Veritas, ADR, IMDG, CSC, ASME and ISO certifications. Immediate availability.
Currently Available
122 units of 40 ft LNG containers in stock, priced at EUR 155,000 per unit.
18 helium containers available, priced at EUR 400,000 per unit.