Details:
3,000 cbm Trailing Suction Hopper Dredger (TSHD)
(rated capacity is 2,000cbm , max working capacity is 3,000 cbm)
Class: CCS, coastal area A1+A2
Built 26 April 2004, Huangshi shipyard in Hubei province China
next dd/ss: 28 April 2024
GRT/NRT: 2318t/695t
LOA: 85.00m
L.bp 83.60m
Beam : 15.00m
Depth : 6.00m
loaded Draft: 4.80m
ballast Draft: 2.44m
deadweight: 3010t
full displacement: 4802.9t
lightship displacement:1452t
Max Dredger Depth: 26.0m
Hopper Capacity: 3,000cbm
M/E: 6PA6L-280 x 2sets, 1050KW ,800RPM, Shanxi Diesel Engine
A/E: YANMAR 6N26, 620KW x 2 sets
total max power: 4162kw of the vessel
twin propeller: 2620mm
gen sets: main gen 2x320kw, harbor gen 1x120kw, emergency gen 1x64kw
Number of dredger: 1 set, at 2.8m width
tank dredging pump capacity: BT7000-20, 1 set at 7000m3/h
rotation of dredging pump: 270rpm
suction pipe : φ700mm/ outlet pipe: φ650mm
hydraulic winches: 2x 20tonsDocument Details Photo's.pdf
Contact the Broker
Disclaimer: ALL DETAILS BELIEVED TO BE CORRECT BUT WITHOUT GUARANTEE - VESSEL OFFERED, AS IS, WHERE IS, SUBJECT TO PRIOR SALE, PRICE CHANGE, OR WITHDRAWAL WITHOUT NOTICE |